The Answer in 60 Seconds
Singapore property insurance settles on one of two bases. Reinstatement (or Replacement) Cost pays the cost of replacing damaged property with new property of the same kind, without deduction for depreciation, wear and tear, or age, subject to the sum insured being maintained at full reinstatement value and the property being actually reinstated within a specified period (typically 12 months). Indemnity Value pays the market value of the property at the time of loss, accounting for depreciation, wear and tear, and age - the insured does not recover "new for old". The choice is structurally controlled by a "Reinstatement Memorandum" clause: with the Memorandum, settlement is on Reinstatement basis subject to the maintenance and rebuilding provisos; without it, settlement defaults to Indemnity. Not every wording follows that pattern: the AIG Singapore Homes Essential Policy Wording Basis of Settlement clause settles "either on (i) an indemnity basis or (ii) replacement as new for old", with any wear-and-tear deduction at AIG's discretion, and the MSIG Singapore SUMO Policy Wording All Risks section indemnifies "by payment or at the Company's option by repair or replacement"; neither carries a Reinstatement Memorandum. For a tenant, the lease matters in two different ways. A repairing obligation during the lease (JTC's standard terms, for example, require the tenant to keep the premises and all items serving them "in good and tenantable repair and condition") can leave the tenant paying to rebuild its own damaged fit-out and equipment, a cost that Reinstatement-basis cover on that fit-out and equipment can fund. An end-of-lease reinstatement obligation (removing the tenant's works and returning the premises) is a make-good cost that a property policy does not pay on either basis. BCA Building Code and SCDF Fire Code compliance imposed on reconstruction can create a "betterment gap" between Reinstatement-basis settlement and actual cost; a Public Authorities Extension covers it where included, but under a wording that caps the total at the item's sum insured, only as far as the sum insured allows. For older plant and IT equipment with rapid depreciation, the structural trade-off is sharper: Reinstatement pays new replacement value but requires actual reinstatement; Indemnity pays depreciated value with no rebuilding obligation. The Building Control Act 1989 and the Fire Safety Act 1993 are the statutory drivers of the betterment-gap risk.

The Sourced Detail
The basis of settlement in a Singapore commercial property policy sits alongside the average clause (covered in the first loss versus full value comparison) as a term that decides what a claim pays. The structural decision between Reinstatement basis and Indemnity Value drives what the SME actually recovers when a loss occurs, and the answer depends on (a) any obligation in the lease to repair or restore after damage, (b) the depreciation profile of the property and equipment, (c) the SME's ability to fund the indemnity-to-reinstatement gap from cash, and (d) the BCA and SCDF betterment exposure on rebuilding.
The two settlement bases defined
Reinstatement (or Replacement) Cost basis. The insurer pays the cost of replacing the damaged property with new property of the same kind and capacity, without deduction for depreciation, wear and tear, or age. The basis is conditional: the sum insured must be maintained at full reinstatement value at the time of loss, and the property must be actually reinstated within a specified period (typically 12 months), on the same site or on another site if the insurer's liability is not increased. If reinstatement is not carried out within the period, the settlement reverts to Indemnity Value.
Indemnity Value basis. The insurer pays the actual cash value of the damaged property at the time of loss, calculated as replacement cost less a deduction for depreciation, wear and tear, age, and condition. The insured does not recover "new for old"; the settlement aims to restore the insured's financial position to substantially what it was immediately before the loss.
Verbatim wording extracts
AIG Singapore Homes Essential Policy Wording, a home insurance wording, states its basis of settlement this way:
"The settlement of any claim under this Policy shall be either on (i) an indemnity basis or (ii) replacement as new for old. A deduction, determined at our sole discretion, may be made for wear and tear and loss of value depending on the age of the item."
The wording leaves the outcome to AIG at claim time rather than to a clause chosen at placement: the same clause says "We will, at Our sole discretion, decide whether to reinstate or pay for the cost of repairs", and it allows a wear-and-tear deduction, "determined at our sole discretion", depending on the age of the item.
MSIG Singapore SUMO SME Insurance All Risks section indemnifies "against accidental loss of or damage to the property specified in the Schedule", "by payment or at the Company's option by repair or replacement". The published SUMO wording carries no Reinstatement Memorandum and no 12-month reinstatement window.
Tokio Marine Insurance Singapore publishes its Fire Insurance and Industrial All Risks wordings; the conventional architecture is identical: Basis of Settlement defaults to Indemnity unless the Reinstatement Memorandum is expressly incorporated.
Chubb Singapore Property All Risks is published as a product page with capacity of up to USD 450 million on a PML basis, placed on a primary, excess or full value basis, at chubb.com/sg-en/business/property-all-risks.html.
The Singapore market convention by property type
Commercial building, warehouse, factory premises. Reinstatement basis is the default for owned premises with a Reinstatement Memorandum; Indemnity remains the default fallback where the Memorandum is not incorporated or where reinstatement is not actually carried out.
Plant, machinery, and equipment. Reinstatement basis on schedule items, with the same Memorandum proviso. The 12-month reinstatement window is critical: extended rebuilding timelines on heavy machinery require either an extended-period endorsement or careful project management to complete within the standard 12 months.
Stock-in-trade. Market value at the time of loss is the conventional measure (structurally an Indemnity-style basis, although the SME may insure to the maximum stock value at risk during the period and adjust by Stock Declaration Memorandum at year-end).
IT equipment, electronics, and rapidly depreciating assets. Market practice is split. Some wordings carve these out from the Reinstatement Memorandum so that depreciation applies. Others apply a reinstatement memorandum, which pays the cost of replacing with property "of the same kind or type but not superior to or more expensive than the insured property when new": a 6-year-old server is paid for at the cost of an equivalent new server, without a deduction for wear and tear, but only if the insured actually replaces it.
Tenants' improvements and fixtures. Where the lease obliges the tenant to repair or restore its improvements after damage during the lease, Reinstatement basis on those improvements is the measure that funds that obligation. An end-of-lease reinstatement (make-good) obligation is a different cost, not insured loss or damage.
Singapore statutory and regulatory framework
The Reinstatement vs Indemnity choice is not directly mandated by Singapore statute. Three statutory bodies drive the SME's effective answer:
The Building Control Act 1989 and the Building Control Regulations. A building reconstructed after a loss must comply with the current Building Code in force at the time of reconstruction. A pre-existing building "grandfathered" under an earlier code loses its grandfathered status to the extent of works that engage current BCA requirements. The Building and Construction Authority publishes the current Approved Document; reconstruction works are required to meet current code regardless of whether the original was compliant.
The Fire Safety Act 1993 and the SCDF Fire Code. Rebuilding after a fire loss must comply with the current SCDF Fire Code, including any new sprinkler, fire-rated separation, or compartmentation requirements. This is a source of "betterment" gaps in Reinstatement settlements: the insurer pays the cost of like-for-like reinstatement, but the SCDF Fire Code may require additions not in the original, leaving the SME to fund the betterment unless a Public Authorities Extension is in place and, under a wording that caps the total at the item's sum insured, the sum insured leaves room for it.
Singapore Land Authority - State leases, JTC Corporation industrial land and factory premises terms, HDB Commercial tenancy conditions. Standard lease conditions impose reinstatement obligations on the tenant at end of lease and (depending on the lease) on damage during the lease. Where the lease obliges the tenant to repair or restore its fit-out after damage during the lease, an Indemnity-basis settlement on that fit-out will leave the SME funding the gap between depreciated value and current rebuild cost. An end-of-lease reinstatement obligation is a make-good cost that the property policy does not pay on either basis.
The Insurance Act 1966 provides the regulatory framework for the conduct of insurance business in Singapore but does not prescribe a basis of settlement.
The Public Authorities Extension (the betterment-gap fix)
A Public Authorities Extension (sometimes called a "Public Authorities Clause"; it is a different extension from "Capital Additions", which covers alterations, additions and improvements made during the period) covers the additional cost of complying with current BCA and SCDF requirements imposed on rebuilding. Fire wordings such as Tokio Marine's and Etiqa's still cap the total recoverable under an item, the Extension included, at that item's sum insured. Without the Extension, the SME funds the betterment out of working capital. The Extension is widely available in Singapore market property wordings but is not universally included as standard; SMEs holding older premises (built before the current code) should specifically request inclusion at placement.
Claim-time worked example: F&B SME leased renovation
A Singapore F&B SME holds a 5-year HDB Commercial lease over a coffee-shop unit. Renovation cost when fitted out 3 years ago: S$280,000. Current replacement cost of equivalent renovation (assumed for this example): S$340,000. Indemnity value, deducting 8% a year for 3 years from the current replacement cost: approximately S$258,400.
Fire destroys the renovation. Settlement outcomes:
Reinstatement basis, sum insured maintained at S$340,000, Public Authorities Extension included. Insurer pays the cost of restoring the renovation to equivalent specification, subject to the SME actually reinstating within 12 months, and the Extension adds the incremental cost imposed by current BCA and SCDF requirements (e.g., additional fire-rated separation between the kitchen and dining area, new sprinkler heads, accessible-toilet provisions). But under a wording that caps the total at the item's sum insured, as Tokio Marine's and Etiqa's do, the payment on S$340,000 insured stops at S$340,000 and the SME funds the S$45,000 betterment; a sum insured of S$385,000 would be needed to fund both.
Reinstatement basis, sum insured maintained at S$340,000, no Public Authorities Extension. Insurer pays up to S$340,000. SME funds the S$45,000 BCA/SCDF betterment out of working capital.
Indemnity basis, sum insured at S$280,000. Insurer pays the depreciated value of approximately S$258,400. SME funds the S$81,600 gap to current replacement cost plus the S$45,000 betterment. Total SME exposure: S$126,600 on a S$385,000 actual rebuild.
Reinstatement basis but sum insured under-stated at S$200,000. The average clause triggers (see when the 85% rule applies), reducing payment proportionately even though the policy is on Reinstatement basis. Payment becomes approximately S$200,000 / S$340,000 = 59% of the actual reinstatement cost, capped at S$200,000.
Claim-time worked example: precision-engineering plant
A Singapore precision-engineering SME holds a 6-year-old CNC machine with original cost S$200,000, current replacement cost S$240,000 (vendor price for current model with equivalent specification), and market value approximately S$96,000 (40% of replacement after depreciation reflecting age, condition, and Singapore market for second-hand precision tools).
The machine is destroyed in a fire. Settlement outcomes:
Reinstatement basis, sum insured at S$240,000. Insurer pays approximately S$240,000 (subject to actual reinstatement within 12 months). SME orders the current-model replacement and is fully made whole.
Indemnity basis, sum insured at S$200,000. Insurer pays the market value of approximately S$96,000. SME funds the S$144,000 gap to current replacement out of working capital or replaces with a 6-year-old second-hand equivalent.
Reinstatement basis, sum insured at S$240,000, but SME chooses not to replace. Settlement reverts to Indemnity Value of approximately S$96,000 because the Reinstatement Memorandum proviso requires actual reinstatement. The SME absorbs the cash difference but retains the option not to replace.
Premium impact
Reinstatement basis needs a sum insured set at the full cost of reinstatement as new, which is higher than a depreciated value, so at the same rate the premium is higher; under the memorandum, a sum insured below that cost makes the insured bear a rateable share of the loss. There is no published GIA Singapore aggregate data permitting a numerical statement of the spread. Decision factors:
- For tenanted F&B, retail, and industrial SMEs whose lease obliges them to repair or restore their fit-out after damage during the lease, Reinstatement basis on that fit-out is the basis that funds that obligation.
- For 10+ year-old, depreciation-heavy plant where the SME would not in fact replace like-for-like, Indemnity is rational.
- For older premises where BCA and SCDF betterment exposure is high, the Public Authorities Extension is the priority placement enhancement.
- For SMEs unable to cash-fund a 12-month rebuild, an Extended Period to Reinstate endorsement should be added.
Common Mistakes / What Goes Wrong
-
Setting the sum insured at historical cost rather than current replacement cost. Where construction costs have risen since the property was built or fitted out, historical cost understates current reinstatement value. An SME insuring at historical cost on Reinstatement basis can still be under-insured and trigger average.
-
Failing to include the Reinstatement Memorandum. Without the Memorandum, the policy defaults to Indemnity basis even where the schedule appears to suggest Reinstatement. The Memorandum text must be confirmed in the issued wording.
-
Missing the Public Authorities Extension on older premises. A pre-2010 building rebuilt to current BCA and SCDF code can carry significant betterment that the SME funds out of working capital absent the Extension.
-
Underestimating IT and electronic equipment reinstatement timing. A 12-month window for replacing custom-built or specification-specific production equipment may be insufficient. An extended-period endorsement should be requested where relevant.
-
Treating Reinstatement basis as automatic. The Memorandum requires both the sum-insured maintenance and actual reinstatement. SMEs that choose not to rebuild after a loss revert to Indemnity settlement.
-
Not aligning the basis with the lease's repair obligation. A tenant on Indemnity-basis cover whose lease requires it to repair or restore its fit-out after damage during the lease funds the gap between the fit-out's depreciated value and its rebuild cost. An end-of-lease reinstatement (make-good) obligation is not covered on either basis.
-
Not testing the sum insured at renewal against a current Reinstatement Cost Assessment. A qualified quantity surveyor's RCA at each renewal is the discipline that prevents under-insurance creep over time.
-
Ignoring the impact of obsolete specifications. Where the original equipment is obsolete and current models have superior specification, a reinstatement memorandum pays for replacement "not superior to or more expensive than the insured property when new", so the cost of the current model can exceed both the settlement and a sum insured set at historical cost.
-
Buying Indemnity-basis cover on long-life assets to save premium. A factory building expected to last 40 years, written on Indemnity for premium reasons, can deliver a heavy gap on rebuilding cost at year 25 of life.
-
Not coordinating Reinstatement basis with Business Interruption Indemnity Period. The Indemnity Period for BI must be long enough to fund operations during reconstruction. A 12-month BI Indemnity Period paired with an 18-month realistic rebuilding timeline leaves the SME exposed for the back end of the rebuild.
What This Means for Your Business
For a Singapore SME procuring property cover, the order of operations is: confirm what the lease obliges you to repair or restore after damage; obtain a current Reinstatement Cost Assessment from a qualified quantity surveyor or valuer; set the sum insured at full reinstatement value, refreshed annually; confirm the Reinstatement Memorandum is in the wording; confirm the Public Authorities Extension is included; verify that the 12-month rebuilding window is realistic for the property type and request an extended-period endorsement if not; and coordinate the Business Interruption Indemnity Period with the realistic rebuilding timeline.
For older premises, depreciation-heavy plant, and obsolete equipment, the Indemnity Value option is rational but should be a deliberate choice grounded in the SME's decision not to replace like-for-like - not a default produced by failing to include the Reinstatement Memorandum at placement.
For tenants whose lease obliges them to repair or restore their fit-out after damage during the lease, Reinstatement basis on that fit-out is the basis that matches that obligation; an end-of-lease make-good obligation is a separate cost that neither basis pays.
Questions to Ask Your Adviser
- Is the Reinstatement Memorandum in our property wording, and what is the rebuilding window (12 months default, longer by endorsement)?
- Is the sum insured set at current reinstatement value or historical cost, and when was the last Reinstatement Cost Assessment conducted?
- Do we have a Public Authorities Extension to cover BCA Building Code and SCDF Fire Code betterment on rebuilding?
- For IT and electronic equipment, does the Reinstatement Memorandum apply or is there a carve-out for depreciation?
- Does our lease (HDB Commercial, JTC, SLA, private commercial) oblige us to repair or restore damage during the lease, and is our insurance basis aligned with that?
- Is our Business Interruption Indemnity Period long enough to fund operations during the realistic rebuilding timeline?
- At renewal, are we re-confirming the Reinstatement Cost Assessment or rolling forward the prior year's sum insured?
Related Information
- First Loss vs Full Value with Average Clause: Property Sum Insured Decision Framework
- Unfair Contract Terms Act 1977: Commercial Limitation of Liability Framework
- Business Interruption Deductible: Hours-Based vs Day-Based vs Dollar-Based Waiting Period
- PSSCOC-lite for Tender Lite (Construction) Effective 1 May 2025: The Insurance Clauses for Sub-S$1m Public Works in Singapore
- MAS Consultation on AI Risk Management Guidelines (13 November 2025): Tech E&O and D&O Implications for Singapore SME AI Vendors
- Limitation Act 1959: Time-Bar Mechanics for Commercial Insurance Claims